Site Login

Lost your password? (close)

SILIVALLY

Welcome, Guest: Join SILIVALLY / / Advertise / Privacy / Recent / Terms and Conditions / News
Stats: 11 members, 5616 topics. Date: Monday, 30th January 2023 at

 

PICTURES OF FOURTH MAINLAND BRIDGE PROJECT

SILIVALLY / / PICTURES OF FOURTH MAINLAND BRIDGE PROJECT (6 Views)

(0) (Reply)

PICTURES OF FOURTH MAINLAND BRIDGE PROJECT by : 7:08 am On December 30, 2022
The Lagos State Government, through the Office of Public Private Partnerships, today announced Messrs CCECC-CRCCIG CONSORTIUM as the preferred bidder for the proposed Fourth Mainland Bridge project,Special Adviser to the Governor on Public Private Partnerships, Mr. Ope George, who disclosed this during a briefing at the PPP Office in Ikeja, said the Fourth Mainland Bridge (4MB) Project, which is a proposed Public Private Partnership (PPP) transport infrastructure development, will comprise of the construction and operation of a greenfield tolled road and bridge with a design speed of 120km/h, including the development of adjacent real estates.He added that the Bridge, when completed, would become the second longest in Africa with three toll plazas, nine interchanges, a 4.5km Lagoon Bridge and an eco-friendly environment. It is also expected to span about 37kilometres, starting from Abraham Adesanya in Ajah, on the Eti-Osa-Lekki-Epe corridor and traverse the North West towards the Lagoon shoreline of the Lagos-Ibadan Expressway via Owutu/Isawo in Ikorodu.

In his words, “You will recall that the Lagos State Government commenced a Competitive Bidding process for the selection of a Concessionaire, by the issuance of the Request for Expressions of Interest (REOI) on 27th of November, 2019. A total of 52 responses were received with 32 being responsive”.“Subsequently, a Request for Quotation (RFQ) was issued on 10th February 2020 to the 32 eligible applicants and responses were received on 15th April, 2020 with a total of 15 responses. Upon evaluation, six bidders met the criteria to progress to the Request for Proposal (RfP) stage”, he added.George explained that the Bids have now been evaluated and Messrs. CCECC-CRCCIG Consortium emerged as the preferred bidder while the Messrs. MOTA-ENGIL (NIGERIA &AFRICA), CCCC & CRBC CONSORTIUM, as the reserved bidder for the Fourth Mainland Bridge project.The Special Adviser restated that the Bridge will reduce congestion on the existing Carter, Eko and Third Mainland Bridges while opening new areas of the City for future developments.https://twitter.com/Mr_JAGs/status/1608539443379556358?t=NensXsrrCX3cOTKRLkrr4g&s=19

Reply


(0) (Reply)

All Domestic Transactions Must Be Naira / CHECK THE DIFFERENCE BETWEEN THE PHOTO / CHECK HOW MANY: Nigerians Renounced Their Citizenship / Digital Revolution to Transform Nigeria To First Smart Nation In Africa / Entangle in Sexual Intercourse in the Titans’ House. /  

(Go Up)

Put your Text Adverts Here...

Sections: Featured Posts on Front Page (5615) Uncategorized (2)

Links: (0) (1) (2) (3) (4) (5) (6) (7) (8) (9)

SILIVALLY - Copyright © 2019 - SILIVALLY. All rights reserved. See How To Advertise.
Disclaimer: Every member is solely responsible for anything that he/she posts or uploads here.